Caveat: Paved with good intentions

I had a fairly productive day today. Firstly, I replaced the pipe that connects the well-head with the “doghouse” (where the pump controller and accumulator tank are), per Richard’s advice. I had some trouble with one of the couplings (brass to PVC), but I finally got it to not leak.
Secondly, I began laying out a “first draft” of the paving stones for the passageway/patio alongside the south side of the kitchen shed. This was a project Arthur had been working on before his accident last year, and I’ve been aware that it’s been bothering him that it wasn’t progressing, so I re-initiated it. Here is the concept, beginning to take shape:
picture
picture

Back to Top